// arthitectural / Publications
  • Hem (hem.com) has acquired the design rights and inventory for more than 200 products from the Italian design company Discipline (discipline.eu). Hem, the home of Design Made Easy, features the most exciting designers of today and tomorrow. Some of the designers who collaborate with Hem to create original designs include: Luca Nichetto, Form Us With […]


    more

  • The Regent Street Association has awarded joint first place to London architecture practices Squire and Partners and Al Jawad Pike for their RIBA Regent Street Window installations, originally held during the London Design Festival in September 2014. Here you can see the article published with their project on arthitectural.com. Squire and Partners’ installation for Brooks […]


    more

Subscribe to
our newsletter
daily

Modern wood architecture from Tierra del Fuego to North Cape. Wood is renewable and sustainable, solid and attractive. Wood can be bent and shaped to the most modern of designs. It is the material of the moment for contemporary architecture and this new volume allows readers to get a glimpse of the most exciting and […]


more

// arthitectural / You may also like to see...

Floating site on the river: This site, where is floating on river and confronted the graceful landscape, was strongly recognized to me as a part of nature, from the first time that I met. From then, I started to visualize “the architectural nature” as a place of recreation. Form of site = Form of architecture […]


more

Located on the north-center of Portugal, the house was meant to combine the rural and the urban lifestyle. The lot is surrounded by different types of constructions, consequence of the informal settlements, characteristics of most Portuguese cities neighbourhoods. The existent stone ruins, vestige of a traditional house and the lot’s configuration, were the main aspects […]


more

In early 1994, the architects began work on the project and while in construction (demolition, grading and foundations) the owner, due to circumstances beyond his control, halted all construction of the project.  Seven years later the owner returned to the architects and asked them to complete the partially constructed house.  Due to code changes, city […]


more