Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

Architecture Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

Oficina Ideias em Linha | Rainha Santa Isabel Secondary SchoolOriginally built during the 60’s as a Technical School (Escola Industrial e Comercial de Estremoz), the complex was recently upgraded into a Secondary School with a larger capacity that will be able to house about 1.000 students. The project was developed under the brief and supervision of Parque Escolar, which promoted a remodelling and updating program on a significant number of secondary schools all over the country.

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

The premises were to provide new functional areas such as classrooms, convivial and management facilities supported by new technological means, attending to the possibilities given by the school’s original structure as well as an adequated urban insertion. The main building’s (Unit A) original structure was kept on the first and second floors, preserving a central corridor and double wing system, housing classrooms in a more rationalized display, which will allow an optimal spatial performance and usage cycle between activities.

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

The secretarial and management areas, as well as the library / resource center were installed on the lower floor. The old workshops on the eastern side of the complex (Unit B) were remodelled in order to accommodate the arts room and a small theatre that will benefit from the unique roof lighting system. The workshops on the western side were demolished, giving place to the new electrotechnical and electromechanical facilities, as well as the refectory and convivial areas, all located on the lower floor.

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

The first floor will accommodate the larger laboratories. The old gymnasium and auditorium were maintained and complemented by health-resort facilities on the lower floor (Unit C). A multifunctional sports unit was also built, connecting to the overall areas of the complex.

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

Oficina Ideias em Linha | Rainha Santa Isabel Secondary School

© Francisco Nogueira

All the outdoor spaces were remodelled and a new green area was placed in order to be accessible both from exterior and interior, from the school’s social areas and refectory.The connectivity between the several units that build the complex is done through a covered pedestrian network, assuring full and comfortable accessibility to the whole complex.

Location: Estremoz, Portugal
Architects: Oficina Ideias em Linha | José Laranjeira
Project team: Ana Abrantes, Doriana Reino, Tiago Coelho, Manuel Banazol, João Pedro Louro
Client: Parque Escolar, EPE
Project year: 2007 – 2010
Project area: 13.000,00 sqm
Landscape architect: Marta Byrne
Structural engineer: Eduardo Monteiro, Afonso Duarte (Profico, Lda)
Water engineer: Gorete Santos (g.r. lda.)
Electrical engineer: Caetano Gonçalves, Luis Gonçalves (Joule, Lda)
Air conditioning engineer: Caetano Gonçalves, Ilídio Guerreiro (Joule, Lda)
Safety engineer: Caetano Gonçalves, Luis Gonçalves (Joule, Lda)
Gas engineer: Augusto Teixeira
Energy certification: Hugo Moreira (Joule, Lda)
Acoustic and photovoltaic engineer: Guilherme Carrilho da Graça (Natural Works, Lda)
Solid waste: Ana Duarte
Safety and health planning: Vasco Rolo (Profico, Lda)
Constrution and demolition waste: Ana Mendonça (Profico, Lda)
Kitchens project: Victor Freire (Arquiprom, Lda)
Materials: Concrete Structure, GRC (Glass Fiber Reinforced Concrete)
Measurements and budgets: Fidélio Santana
Contractor: Seth / Engiarte / Edificadora Luz & Alves
Site coordination & construction supervision: prospectiva / gibb / efs
Photos: Francisco Nogueira (architectural photography)

Digg This

 
 

 

Digg This

Have anything to say?

// arthitectural / You may also like to see...

TheeAe LTD was commissioned to design + build the Coffee Bean & Tea Leaf in Grand Plaza, Mong Kok, Hong Kong as the second project. We were required to follow one of styles called ‘Lounge’ that CBTL has in their design standard types.       The mall of the shop has extremely low ceiling […]


more