// arthitectural / Football
  • Athletic Club of Bilbao is one of the big clubs in European football and its previous stadium, over a hundred years old, was one of the legendary ones, popularly referred to as the cathedral of football. Located practically in the same place as the existing one, the new stadium overlaps with the old San Mames. […]


    more

  • A 500-seat model stadium designed by Arup Associates played a significant role in Qatar’s successful bid to host the 2022 FIFA World Cup. While football’s governing body is keen to use the event to promote the game in parts of the world where there is the potential to develop new audiences, it had strong doubts […]


    more

Subscribe to
our newsletter
daily

The origins of this Project lie in the relationship between the sports placed at the facilities and the features of the site: a 25,226 m2 plot of land with a step downward slope and marked drops in height towards the west and towards the neighboring green space to the north. This proposal meets the needs […]


more

// arthitectural / You may also like to see...

Nordea’s new office building in Ørestad North, Copenhagen, will house 1,800-2,200 employees and be ready for inauguration in 2016. To the south, the building is characterised by a sophisticated, sloping park landscape and to the north by an open ground floor and tile facades on the lower floors. Nordea’s new building introduces a new medium scale […]


more

Concept of design: Time taking Form into Shape-Shifting Architecture What if Time could materialize itself into Architecture and Art? It would not be static; its shape would continuously be changing. Time would become a living space of Shape-Shifting Architecture that continuously transforms itself into abstract forms from the natural world: Time taking Form. Designed by […]


more

This project consisted on adapting a construction volume to the landscape, in a form of a contemplative “plateau” pointed at important visual frames. The house itself is the sum of multiple episodes, attached according to an interior/exterior hierarchy from wich the form is scoped. The functional programme is organized through an “L” shaped volume for […]


more