With its richly patterned cladding of spandrel, clear glass and carefully scaled massing, the Durham Consolidated Courthouse, completed in January 2010, makes a significant contribution to the emerging urban framework of downtown Oshawa. Its bold, modern vocabulary emphasizes transparency and openness both for users and passersby.

A large outdoor public space, Courthouse Square, is the forecourt to the building entrance. The scale of the main entrance pavilion on the square establishes a sense of dignity, appropriate for the front door of a courthouse.

Providing badly needed space for the Province´s judicial system, this six-story, 40,000 m˛ structure houses 33 courtrooms, associated support space and prisoner-holding facilities. For planning efficiency, high-volume functions are located at or close to grade. The public circulation system is highly legible for first time users.

Exhibiting a new typology for a typical courtroom floor, the design has a “back to back” arrangement of courtrooms that results in short walking distances for judges and staff. For participants in court proceedings, the availability of natural light and outdoor views in the courtroom waiting areas will provide some stress relief.

Legacy contribution

The courthouse represents a physical embodiment of our justice system interpreted in a modernist language. Solid building elements serve to express the stability and permanence of the courts. Welcoming to the public, the courthouse elevations are highly transparent, using clear glass with a rich mosaic of white ceramic frit glass panels. The scale of the main entrance pavilion creates a formality and sense of dignity, appropriate for the front door of a courthouse.

Contribution to a sustainable environment

The project is the first LEED NC Gold Provincial Government Building to be completed. It has a compact plan that minimizes the exterior envelope, contributing to an overall building energy consumption that is 42% less than the Model National Energy Code for Buildings (MNECB).

Budget

This is the first project to be delivered using the Province of Ontario’s Alternative Financing and Procurement framework and is a good example of how design excellence can be achieved by utilizing private financing.

Response

The courthouse is setback from Carriage Works Road to create a Courthouse Square of significant size that acts as a formal forecourt for the building. Providing over one acre of new landscaped open space, the project gives the City a significant new public amenity. The single public building entry is centrally located on the Square. The building mass parallels the street grid. Building setbacks serve to mediate between the surrounding properties and the large mass of the proposed building: a continuous 10m high street wall creates a strong urban edge and pedestrian scale along Bond Street compatible with the existing adjacent low structures; above the second floor the building steps back. On the west, the main building core is raised to create a visual terminus, looking east from the proposed linear park. At the southeast corner of the site, a column of glass that is illuminated at night creates a strong gateway to downtown Oshawa.

Context

The Durham Consolidated Courthouse’s location and siting establish its significance as a major civic building within an urban community. The site, 3.9 acres in size in downtown Oshawa, is bounded by Bond Street on the south, Carriage Works Drive on the west, and Division Street on the east. A surface parking lot has been built to the north. A new development that includes a linear pedestrian park is planned to the west. To the south and east there are two and three storey structures.

Innovative aspects

The project exhibits a new typology for a typical courtroom floor that has a “back to back” arrangement of courtrooms that results in short walking distances for judges and staff. The availability of daylight and views to the outside in the courtroom waiting areas will reduce stress for the participants in court proceedings.

Business Goals

A simple clear building organization promotes the efficient delivery of justice. Components are located based upon their need to be close to the main entrance or other building components. The public circulation system is highly legible for first time users.

Distinctions

The American Institute of Architects Academy of Architecture for Justice has awarded a certificate of merit to WZMH Architects for this project. Also, it was selected for publication in the 2008 Justice Facility Review.

Location: 150 Bond Street East, Oshawa, Ontario, Canada
Building Area: 41,957 sqm˛
Construction cost: 190 Million
Date completed: January 2010
Client name: Infrastructure Ontario
Architects: WZMH Architects
Architect team members: Carl Blanchaer, Nicola Casciato, Hady Lotfy, Paul Brown, Jamie Lee, Agnes Tong, Dorota Gajewnik, Janet Nowakowski, Sherri Zhang, Emma Qian, Maria Cabrera, Ferah Rahman, Armis Kermanpour, Mark Horwitz, Glen Herglotz
Structural Engineer: Halsall Associates Limited
Mechanical Engineer: The Mitchell Partnership Inc.
Electrical Engineer: Stantec
Landscape Architect: Quinn Design Associates Interior Designer: Cannon Design
Contractor: PCL Constructors Canada Inc.
Photographer: Shai Gil