// arthitectural / extension
  • The Gyula Trebitsch school at Hamburg will be extended and the architects von Gerkan, Marg and Partners (gmp) have been commissioned to build the extended replacement building to their designs. This was the result of the design commission negotiated under VOF (German procedure for commissioning freelance services) following the competition win. The new building for […]


    more

  • Will Alsop’s RIBA award-winning Blizard Building completed in 2005 has been such a huge success that the Queen Mary University commissioned aLL to design an extension to the building. The Blizard Building was developed with channeled information from detailed client consultation workshops and resulted in a transparent box which reveals the university research inside. Huge […]


    more

Subscribe to
our newsletter
daily

The fourth extension of the German National Library in Leipzig is bold and unconventional. According to the architect, Gabriele Glöckler: “The concept ‘envelope– cover – contents’ translates the function of the building into architecture. “Function creates form”, is the architect’s motto. “The contents are protected by a compact cover around the repository area. A lighter […]


more

// arthitectural / You may also like to see...

Being a summer house, the main idea is not only creating the interior spaces of the house, but distribute all outer space. The interior spaces seek good relations with the outside world, colonizing their surroundings and their views. Inspired by the typical Menorca “tanca”, stone walls divisions of the realm. The plot is organized from a […]


more

Bale (Valle in Italian) is a small village in Istria peninsula, Croatia with mostly agricultural population of 1000 people. The project for the new sports hall has been faced with the rich historical, cultural and social Mediterranean context. Therefore any new architectural interpolation had to have a respectful approach to the environment. The solution has […]


more

This Chinese hotel, made from all prefabricated materials, was built in six days. It is level 9 earthquake-resistant, sound-proofed, thermal-insulated, and 15-stories tall. According to the builders, there were no injuries and virtually no waste, due to the prefab materials. According to the video, no stationary cranes were used in construction and there wasn’t single […]


more