// arthitectural / Architecture / Cibinel Architects | Brandon Firehall No.1

Cibinel Architects | Brandon Firehall No.1

Architecture Brandon Firehall_0165_CROPPED

The dynamic new 30,000 sq ft Brandon Fire and Emergency Services Building validates the idea that a primarily utilitarian program, which often times results in a prefabricated solution, can become a sophisticated architectural project that contributes to its surrounding community and landscape while still fulfilling its demanding functional requirements and modest budget.

The facility is divided into two formal components, a fire hall wing and an administrative wing. Severing the two components through the formal gesture of a pivot appropriately orients the fire hall wing with the street and aligns the administrative wing with the creek to the northwest. The separation allows daylight to penetrate the buildings on all sides, and a single-loaded corridor animates the façade with human movement and activity. A minimally detailed, non-programmed transparent volume situated between the two wings acts as a dramatic entry into both sections of the facility, mediating the two programs with a thin hovering glulam bridge.

The public entry engages and welcomes the community with a generous landscaped public ‘plaza’ enclosed by the museum to the north, and the apparatus floor to the south. The museum features a “Bickle”, an 80-year-old fire truck situated as if it is ready to take off to the next call, while the apparatus floor houses the current emergency fleet. Extensive glazing surrounding the plaza highlights the rich history of the fire department in the City, and allows visitors a glance into a state of the art facility.

A dramatic hose tower stands proud in the landscape and acts as an urban marker for people entering the City along the neighbouring street. Through a series of walls and fire separations, the tower also acts as a training facility and exit stair connecting the apparatus floor with the dorms on the second level. By integrating training facilities within the building, the availability of low ad no-cost training opportunities was expanded. Impervious dark brick cladding descends the tower and wraps around the building’s horizontal walking surfaces, allowing for a natural runoff of water to be reabsorbed by the site’s indigenous grasses.

The solution integrates functionality seamlessly into the aesthetics, giving appropriate expression to the demands of the facility while creating unique and effective civic presence in the community.

Location: 120 – 19th Street North, Brandon, Manitoba, Canada
Architect: Cibinel Architects Ltd
Design Team: George Cibinel, Marty Kuilman, Jason Kun, Travis Cooke, Candace Wiersema, Markian Yereniuk, Brian Pearson, Mike Karakas, Joseph Orobia, Catherine White
Collaborators: Collins Design Service – Fire Station Consultant
Engineers: Crosier Kilgour & Partners Ltd, Epp Siepman Engineering Inc, Nova 3 Engineering Ltd, Williams Engineering Inc, M. Block & Associates Ltd Landscape Architects: Hilderman Thomas Frank Cram Landscape Architecture & Planning
Client: City of Brandon
Contractor: BIRD Construction
Size: 30,000 sq ft
Cost: $9.3 million
Completed: September 2010
Awards: F.I.E.R.O. Fire Station Design Award of Merit, 2009
Photographer: Mike Karakas

Sharing is Caring...
Share on FacebookTweet about this on TwitterShare on Google+Share on RedditPin on PinterestShare on LinkedInShare on StumbleUponShare on Tumblr

via: v2com.biz

Sharing is Caring...
Share on FacebookTweet about this on TwitterShare on Google+Share on RedditPin on PinterestShare on LinkedInShare on StumbleUponShare on Tumblr

Have anything to say?

// arthitectural / You may also like to see...

The new campus of TAC SEV is built across from the existing property of Tarsus American College (TAC). Considering its proximity to the historic context of the school, the new campus is conceived, as a design principle, a part of the TAC campus it is separated from by a road that traverses the premises. An […]


more